Alongside the AIRDEPO park, KKIG Holding will build a new underground drinking water reservoir for the village of Tuchoměřice.
The reservoir will have a capacity of 500,000 litres (2 x 250 m³). The village currently has a combined storage capacity of 500,000 litres in an existing underground reservoir (300,000 litres) and an above-ground reservoir (200,000 litres). Once the new reservoir is operational, the total storage capacity of all reservoirs in Tuchoměřice will reach an impressive 1,000,000 litres of drinking water. Construction of the new reservoir will run alongside the AIRDEPO development and is scheduled for completion in the summer of 2025.
Interested?
Get in touch.
We would be happy to show you available units and prepare a tailored offer for you.

